Red Mountain Energy
Eng Rus
About Us
News
Service
Careers
Contacts
газопоршневые компрессоры
   
  • Compressors
    • Application compressors
      • Power generation
        • Centrifugal gas boosters for power stations
        • Reciprocating gas boosters for power stations
      • Oil and gas treatment and processing
        • Hydrogen centrifugal compressors
        • Hydrogen reciprocating compressors
      • Oil and gas extraction
        • Reciprocating compressors with gas engines
        • Integrated motocompressor Ajax
    • Centrifugal compressors
      • Maestro control system
      • TURBO-AIR series
      • MSG series
    • Reciprocating compressors
      • AJAX
      • Superior
    • Equipment producers
    • Support equipment
      • Compressed air dehydration systems
      • Cooling towers
    • Questionnaire
    • Project examples
  • Air separation
    • Application
      • Steel industry
      • Oil and gas extraction. Refining
    • Air separation units
      • Cryogenic plant
      • Pressure swing adsorbtion
      • Membrane plant
    • Cryogenic tanks
      • Stationary Cryogenic Tanks
        • Flat bottom
        • Elliptic bottom
      • Trailers Cryogenic Tanks
        • Tank Trailers
        • Transport Tanks
        • Tanker Semi-Trailers
    • Partner
      • Hangzhou Hangyang
      • SOPC
    • Support equipment
    • Questionnaire
    • Completed projects
      • OOO Argus (industrial gases)
      • OOO Nefteyugansk Promservice
      • OAO Lukoil-Odessa NPZ (Refinery)
      • OOO Micom, (industrial gases)
  • Gas processing
    • Gas processing plants
    • Mechanical impurities cleaning
    • Compression
    • Sour gas treatment
    • Sour gas utilization
      • Gas re-injection
      • Sulfur recovery. Klaus process
    • Gas drying
    • Cooling
    • Gas-gasoline process
    • Commercial products
    • Liquefaction of gases
    • Questionnaire
    • Turboexpanders for hydrocarbons
      • Service
  • Coal Bed Methane
  • Coal gasification
    • Coal gasification process
    • Air separation for coal gasification
    • Gas treatment for coal gasification
    • Gas compressing for coal gasification
    • Engineering for coal gasification
    • Project with Secure Energy
  • Power Generation
    • EPC of Power Facilities
    • Mini thermal generator sets
    • APG Utilization
    • New technologies for the coal power industry
      • Plasma-fuel systems for starting up boilers
      • Dry ash handling
»  Application compressors»  Oil and gas treatment and processing »  Hydrogen centrifugal compressors

Plant Modernization Project: Centrifugal Compressor for Hydrogen-rich Gas Recycling in LG-35 Unit


Project Overview


Catalytic reforming with R-56 bimetallic catalyst (platforming) is one of the most important processes used in petroleum refining industry. This process plays a central part in the production of high-octane components for automotive and aviation fuels.


Process unit LG-35-11/300-95 with a feedstock capacity of 300.000 tons per year. The unit is operated in a gasoline mode producing high-octane component with research octane number up to 95.


The catalytic reformer consists of the following sections:

  • Straight-run gasoline (naphtha) preliminary hydrotreatment
  • Hydrotreated gasoline (hydrogenate) platforming
  • Platformate stabilization.

There are two process streams:

  • Feedstock stream
  • Hydrogen-rich gas stream.

Raw hydrogen-rich gas with hydrogen content of not less than 75% vol. flows from the discharge of CK-1 recycling compressor of the reformer unit into the intake line of hydrotreating recycling compressors. Reformer feedstock at a pressure up to 50 kg/cm2 is fed through filters into the tee for blending with hydrogen-rich recycle gas from CK-1 centrifugal compressor.


Within the scope of LG-35 Unit modernization and upgrading package CK-1 compressor will be changed over to standby duty mode and a new CK-2 compressor will be made the main one and connected in parallel to the existing unit.

Both units are centrifugal compressors, but the former one has a drum design, and the latter is a multi-shaft-unit with a built-in speed increaser multiplier and three compression stages.

To accommodate the second compressor a knockdown shelter will be constructed on the plant premises.


Detail documentation was developed by the refinery's engineering department based on the basic design stage (detail design specifications).


A 3-D model of the proposed compressor station was developed according to the version proposed at the basic design stage; design assignments were prepared for the construction of the compressor foundation, shelter, process piping, power supply and instrument connections, along with detail drawings and diagrams. Necessary corrections and additional provisions were incorporated in the detailed documentation in accordance with the plants existing LG-35 operating procedure and applicable safety standards.


Specific features of this project include the following:

  1. New equipment is to be connected to existing process unit.
  2. Variable gas composition (hydrogen-rich gas) compressor is to be adjusted to the variations of gas molecular weight.
  3. A part of the process gas will be diverted to other plant cycles (besides the main process in LG-35), for this reason the new compressor will have a 1.5 greater capacity than the existing one, while the turndown limit of the new compressor (using inlet guide vanes) will correspond to the rated capacity of the existing compressor.
©RedMountain Energy 2008